Senior Consultants, Inc.

  • Home
  • About SCI
  • DIR Contract Page
  • DIR Service Specs
  • DIR Manufacturer Links
  • Quotes / Purchase Orders
  • Returns/Warranties
  • DIR Contract Pricing
  • Contact Us
  • For Federal Customers
    • Home
    • About SCI
    • DIR Contract Page
    • DIR Service Specs
    • DIR Manufacturer Links
    • Quotes / Purchase Orders
    • Returns/Warranties
    • DIR Contract Pricing
    • Contact Us
    • For Federal Customers

Senior Consultants, Inc.


  • Home
  • About SCI
  • DIR Contract Page
  • DIR Service Specs
  • DIR Manufacturer Links
  • Quotes / Purchase Orders
  • Returns/Warranties
  • DIR Contract Pricing
  • Contact Us
  • For Federal Customers

DIR Service Specifications

 SCI Offers Three Cabling Pricing Options to the DIR Customer: 

Per Cable Pull LABOR ONLY

Per Cable Pull LABOR AND MATERIAL OFFICE ENVIRONMENT

Per Cable Pull LABOR AND MATERIAL

 This Service includes all labor to complete a cabling project including fishing walls, running cable through modular furniture, terminating, testing, labeling, and providing certification reports, as-built floor plans, and warranty information. Price per pull includes all travel expenses necessary to complete the cabling project, unless otherwise noted in the contract. The Customer provides, on-site, all materials necessary for the completion of the cabling project.
 

Per Cable Pull LABOR AND MATERIAL

Per Cable Pull LABOR AND MATERIAL OFFICE ENVIRONMENT

Per Cable Pull LABOR AND MATERIAL

 This Service includes the materials necessary to complete a cabling project including cable, electrical boxes, color coded inserts, jacks, patch panels, 66M150 blocks equipped with 89B brackets and/or 110 blocks, wall plates, patch cords, and all devices as needed for proper hanging and molding as required, plus all labor including fishing walls, running cable through modular furniture, terminating, testing, labeling, and providing certification reports, as-built floor plans, and warranty information. The price per pull includes all costs, including conveyances, to complete the cabling project, unless otherwise noted in the contract.
 

Per Cable Pull LABOR AND MATERIAL OFFICE ENVIRONMENT

Per Cable Pull LABOR AND MATERIAL OFFICE ENVIRONMENT

Per Cable Pull LABOR AND MATERIAL OFFICE ENVIRONMENT

 In this Service, the cost per cable pull includes cable, electrical boxes, color coded inserts, jacks, wall plates, and patch cords.  The cost per cable pull represents all labor including fishing walls, same day lacing of cable through modular furniture, terminating, testing, labeling, and providing certification reports, as-built floor plans, and warranty information. The price per pull includes conveyances, necessary to complete the project, unless noted otherwise in the contract. Additional material such as patch panels, hanging devices, and molding will be quoted as needed from the cable material price list. 


Copyright © 2021 Senior Consultants, Inc. - All Rights Reserved.

Powered by GoDaddy